Skip to main content
Book a 15-minute call
Book a 15-minute call

Interior design licence, separate from fit-out

Designing interiors and building them are separate businesses in Dubai. Building is contracting, with its own register and permits.

Hands comparing grey and black marble samples over a white stone table and floor plan
Usual route
Mainland or free zone
Extra approval
By service
AML
Standard bank checks
At a glance

An interior design licence in Dubai lets a studio sell design work, from first concept to the finishes schedule, on a DET or free zone licence. Architectural or engineering drawings for authority approval need Dubai Municipality registration under Law 14 of 2025. Building the fit-out on site is contracting under Law 7 of 2025, and the two laws keep consultancy and contracting independent.

Covers
Interior concepts, layouts, finishes and styling for clients
Not covered
Fit-out works, which need a contracting activity and registration
Premises
A studio or office that fits your team
Timeline
Days for a design studio; weeks to months for fit-out

What an interior design licence covers

Scope follows what you sell. Drawings for authority approval and works on site each fall under another activity.

Inside this licence

Outside this licence

A registered contractor may not own or work for an engineering consultancy office, so a studio that also wants to build plans its structure before applying.

A studio's base and its clients

Design work runs from either route. Site work across Dubai usually means a DET licence, with an office lease registered in Ejari.

Likely route by where most of your clients are
If most of your clients areLikely routeWhy
Clients abroad or in free zonesFree zoneDesign work delivered from a studio suits a free zone licence
Homeowners and businesses on the mainlandMainland (DET)Mainland clients and site visits sit naturally on a DET licence
Tenants who also want the fit-out builtMainland (DET)On-site works need a DET licence and contractor registration

Mainland design projects can run from a free zone studio holding either a DET branch licence or the six-month DET operating permit. Both come from Executive Council Resolution 11 of 2025. Fit-out work needs the branch licence, with Dubai Municipality's approval. Any mainland income may shift the company's QFZP position.

Studios designing for clients abroad or in other zones often work from a free zone, sized to the design team's visas. Compare free zones

Company formation in the UAE

Who approves design and fit-out

Design alone needs only the licence wording. Dubai Municipality registers engineering offices and also keeps the contractor register that fit-out firms join.

  1. Before the licence

    • Trade name and initial approvalDET
  2. The licence

    • Trade licenceDET
  3. After the licence

    • Engineering office registrationDubai Municipality
    • Contractor registration, for fit-outDubai Municipality
    • Fit-out permit per projectThe area's authority, such as DDA
    • Corporate bank accountThe bank
    • Visas for designers and site staffMOHRE for permits, GDRFA Dubai for visas

We map which registrations your services need before the licence is filed.

Which lane your services fall in

Tick what you plan to sell to see which kind of firm each service needs.

Ticking both drawings and site works means a structure decision comes first. The 2025 laws keep the two independent.

Tick each service you plan to sell.

Tick each service you plan to sell.
What you planPoints to
Design studio licence
Design studio licence
Design studio licence
Engineering consultancy office
Engineering consultancy office
Registered contractor
Registered contractor

Fit-out deposits and the bank

Bank viewStandard for design; closer look for fit-out deposits

Most banks see a design studio as a standard file, with professional fees from a handful of clients. Fit-out draws a closer look.

Client deposits arrive in large amounts and leave quickly for materials and subcontractors, so the bank asks for the signed contracts behind them. The payment schedule for each project goes into the file too, giving every large transfer a reason on record.

Overreach on a design licence

  1. Fit-out quoted on a design licence

    A client who likes the design often asks the studio to build it. Executing fit-out works is contracting. Taking that job on a design licence leaves the company outside the contractor rules that apply across Dubai.

  2. Permit drawings from the wrong firm

    Drawings submitted to the authority come with engineering responsibility. Under Law 14 of 2025, only a licensed office registered with Dubai Municipality may present itself as an engineering consultancy.

  3. Expecting one permit route everywhere

    Each area's authority issues its own fit-out permits and asks for its own file. A unit in a Dubai Development Authority community and one on general mainland land can follow different paths.

Interior design questions

A question about your plan? Describe your interior design and fit-out plan and an advisor replies on WhatsApp.

Ask on WhatsApp

How do I start an interior design business in Dubai?

Start from what you will sell, because design, permit drawings and building works are separate businesses in Dubai. A studio selling concepts and finishes needs a DET or free zone licence with the design activity.

How much does an interior design licence cost in Dubai?

The services you sell drive it. Design alone needs a licence, a studio and team visas, while fit-out adds a contracting activity, Municipality contractor registration, a permit per project and site staff.

Do I need a licence to work as an interior designer in Dubai?

Yes, to sell design work to clients. The trade licence carries the design activity, from DET or a free zone, and permit drawings or site works each need a further registration.

Can an interior design company also do fit-out works in Dubai?

Yes, with a contracting activity and Dubai Municipality contractor registration. Dubai law keeps contractors independent of engineering offices, so a studio that also does permit drawings settles its structure before filing.

Do interior design companies need Dubai Municipality registration?

Only for some services. Engineering consultancy, architectural work included, needs Dubai Municipality registration, and fit-out works need a place on the contractor register. A studio selling concepts and finishes just needs the right licence wording.

Who applies for the fit-out permit in Dubai, the designer or the contractor?

The contractor, in Dubai Development Authority communities, with the tenant's appointment letter and the owner's NOC. Other areas follow the authority that runs them, so the route is confirmed unit by unit.

Can a free zone interior design company work on projects in Dubai?

Yes, for design, through a DET branch licence or DET's six-month operating permit. Fit-out works need a branch licence approved by Dubai Municipality, and mainland income can change the QFZP position.

How long does an interior design studio licence take in Dubai?

Days for a design studio, since the licence wording is the main step. Adding fit-out works takes weeks to months, because contractor registration and classification follow the licence.

How do I start a fit-out company in Dubai?

As a contracting business first. It needs a trade licence, usually from DET, with a fit-out contracting activity, then a place on the Dubai Municipality contractor register. Each project then carries a permit from the area's authority.

Should an interior design studio be on the mainland or in a free zone?

Either works, and your clients decide. A free zone suits design for clients abroad or in free zones. Mainland clients are simplest on a DET licence, which a studio that also builds usually takes anyway.

Will your studio build what it designs?

Building it needs a contracting activity as well. If your services run from concept to site, we set out the activity wording and a structure that keeps designing and building apart.

On the call

  1. Permit drawings and engineering responsibility
  2. Where your fit-out projects sit

Replies within two business hours.
About the firm
Prefer to write? Send the details

Portrait of your advisor