Data centre licence, racks or your own hall
Reselling rack space is a light licence. Building your own hall, or hosting for government, brings approvals of its own.

- Usual route
- Mainland or free zone
- Extra approval
- DEWA power
- AML
- Standard bank checks
A data centre licence in Dubai is issued by DET or a free zone, with colocation as the core activity and hosting added when you manage clients' machines. Renting out racks in an existing facility is the simplest model. A hall of your own brings in DEWA, whose connection must match the load. Cloud work for Dubai government bodies needs DESC certification.
- Covers
- Renting rack space, power and cooling for client-owned servers
- Not covered
- Selling internet connectivity, which stays with TDRA-licensed carriers
- Premises
- Your own hall, or contracted space in an existing facility
- Timeline
- Weeks to resell capacity; months or longer to build a hall
Inside a data centre licence
Colocation rents rack space to clients who bring their own servers. Power, cooling, cross-connects and remote hands come with the space.
Inside this licence
Outside this licence
- Covered by TDRA-licensed telecom operators
- Covered by Data processing and hosting
- Covered by Cyber security company
- Covered by IT equipment trading
Tick what you plan to do. The result shows here.
We fix the wording before you apply. Send us your list on WhatsApp
Managed IT and software sold as a service are separate activity codes again, added only if you sell them.
Choosing a data centre route
The licence route follows your tenants. For a hall of your own, the plot comes first, because Dubai Municipality or the zone's authority issues the building permit.
| If most of your clients are | Likely route | Why |
|---|---|---|
| Reselling racks in an existing facility | Either route | A light licence that can sit wherever your clients and team are |
| Building a hall on your own plot | Either route | The authority over the plot approves the building, so land comes first |
| Hosting and cloud for mainland clients | Mainland (DET) | Hosting income from mainland clients usually falls outside the free zone 0% rate |
| Overseas tenants needing a Gulf point of presence | Free zone | Clients outside the mainland suit a free zone licence well |
Serving mainland tenants from a free zone takes a DET branch licence or permit. Executive Council Resolution 11 of 2025 allows both. For QFZP, that hosting income usually counts as non-qualifying.
A free zone suits operators whose tenants are abroad or inside the zones, and we check the host facility sits in that same zone. Compare free zones
Three questions. The closest row is marked in the table above.
Your likely route shows here.
Building, power and hosting approvals
A reseller needs the licence and a sound capacity contract with the host. Building your own hall brings in Civil Defence for the fire systems and DEWA for the power supply.
Before the licence
- Initial approval for the colocation activityDET or the free zone
The licence
- Trade licenceDET or the free zone
Alongside the licence
- Building permit for the hallThe authority over the plot
- Fire safety approvalDubai Civil Defence
- Power connection and capacityDubai Electricity and Water Authority (DEWA)
After the licence
- Cloud certification for governmentDubai Electronic Security Center (DESC)
- Corporate bank accountThe bank
We time the licence to your first tenant's move-in date.
What does your data centre model add?
Select the models you expect to run in the first two years to see what they add beyond the licence.
Power capacity is usually the slowest part of a new hall, so we raise the DEWA connection before the lease or plot is signed.
Tick every model the business will run
| What you plan | Points to |
|---|---|
| The licence with colocation and hosting activities, plus tight contracts with the host facility | |
| The licence with colocation and hosting activities, plus tight contracts with the host facility | |
| DESC cloud service provider certification before Dubai government bodies can use it | |
| Links bought from TDRA-licensed carriers, since only they sell connectivity | |
| A building permit, Civil Defence fire approval and a DEWA power connection | |
| A building permit, Civil Defence fire approval and a DEWA power connection |
Tick a line to see where your plan points.
What banks ask a data centre operator
Bank viewStandard, with close reading of equipment imports and lease costs
A data centre spends heavily before it earns. Servers and cooling plant are paid for abroad early, because the kit has to be in the racks before any tenant pays.
Two documents show where income will come from. One is the facility lease or capacity contract, and the other is the first signed tenant agreement.
Data centre contract traps
A lease signed before power is confirmed
Rent starts on signature. If DEWA has not yet confirmed the connection and its capacity, the hall sits idle, unable to take a single loaded rack.
Hosting left off a colocation licence
Running applications or cloud services for a tenant counts as hosting, which is a separate activity. Contracts signed before it is added fall outside the licence.
Promising connectivity the licence cannot sell
Internet links are a telecom service sold by TDRA-licensed operators. A tenant contract that bundles bandwidth as your own product needs rewording around the carriers in your building.
Data centre questions
A question about your plan? Describe your data centre plan and an advisor replies on WhatsApp.
Ask on WhatsAppWhat are the requirements for a data centre licence in Dubai?
How much does a data centre licence cost in Dubai?
How to start a data centre business in Dubai?
Can a foreigner open a data centre company in Dubai?
What are the power requirements for a data centre in Dubai?
Do I need a building permit for a data centre in Dubai?
Can I open an AI data centre in Dubai?
Do I need a separate licence for cloud hosting in Dubai?
Which cloud rules apply to hosting Dubai government data?
Can I resell rack space in Dubai without building a data centre?
Can a data centre company set up in a free zone?
Related pages
Software and IT company setup in DubaiA software company license in Dubai: the activity classification, free zone or mainland, QFZP exposure on mainland clients, visas and banking.- AI company licence in DubaiThe licence itself is quick once the activity matches what you build.
Corporate bank accounts in DubaiCorporate bank account opening in Dubai, prepared before you apply: the file a UAE bank reads, the right bank for your profile and a strong first file.
Reselling racks or building your own hall?
Each one needs a different power request. Your advisor reads your plan for the first two years and names the activities to file and the approvals that come with them.
On the call
- Colocation, hosting or government cloud
- The host facility or your own plot