# Interior design licence, separate from fit-out

Designing interiors and building them are separate businesses in Dubai. Building is contracting, with its own register and permits.

[Book a 15-minute call](https://calendar.google.com/calendar/appointments/schedules/AcZssZ3iUsl6OhHy5YEyFEpygJBYbMbGDZ7fIiA2jzn36qH26vKRo_PDEpn0EzJeySwjrl1R9zHtZnVN?gv=true)[Or message us on WhatsApp](https://wa.me/971585562152?text=Hi%20DM%20Consultancy%2C%20I%27d%20like%20to%20check%20the%20interior%20design%20and%20fit-out%20activity%20for%20my%20business.%20Please%20share%20the%20next%20step.)

![Hands comparing grey and black marble samples over a white stone table and floor plan](https://dm-uae.com/assets/images/activities/interior-design-fit-out.webp)

Usual route

Mainland or free zone

Extra approval

By service

AML

Standard bank checks

At a glance

An interior design licence in Dubai lets a studio sell design work, from first concept to the finishes schedule, on a DET or free zone licence. Architectural or engineering drawings for authority approval need Dubai Municipality registration under Law 14 of 2025. Building the fit-out on site is contracting under Law 7 of 2025, and the two laws keep consultancy and contracting independent.

Covers

Interior concepts, layouts, finishes and styling for clients

Not covered

Fit-out works, which need a contracting activity and registration

Premises

A studio or office that fits your team

Timeline

Days for a design studio; weeks to months for fit-out

## What an interior design licence covers

Scope follows what you sell. Drawings for authority approval and works on site each fall under another activity.

### Inside this licence

-
-
-
-

### Outside this licence

- Covered by [Construction contracting](https://dm-uae.com/activities/construction-contracting/)
- Covered by [Engineering consultancy office](https://dm-uae.com/activities/engineering-consultancy/)
- Covered by [Technical services](https://dm-uae.com/activities/technical-services/)
- Covered by [Furniture trading](https://dm-uae.com/activities/furniture-trading/)

A registered contractor may not own or work for an engineering consultancy office, so a studio that also wants to build plans its structure before applying.

## A studio's base and its clients

Design work runs from either route. Site work across Dubai usually means a DET licence, with an office lease registered in Ejari.

Likely route by where most of your clients are

| If most of your clients are | Likely route | Why |
|---|---|---|
| Clients abroad or in free zones | Free zone | Design work delivered from a studio suits a free zone licence |
| Homeowners and businesses on the mainland | Mainland (DET) | Mainland clients and site visits sit naturally on a DET licence |
| Tenants who also want the fit-out built | Mainland (DET) | On-site works need a DET licence and contractor registration |

Mainland design projects can run from a free zone studio holding either a DET branch licence or the six-month DET operating permit. Both come from Executive Council Resolution 11 of 2025. Fit-out work needs the branch licence, with Dubai Municipality's approval. Any mainland income may shift the company's QFZP position.

Studios designing for clients abroad or in other zones often work from a free zone, sized to the design team's visas. [Compare free zones](https://dm-uae.com/free-zones/)

[Company formation in the UAE](https://dm-uae.com/company-setup/)

## Who approves design and fit-out

Design alone needs only the licence wording. Dubai Municipality registers engineering offices and also keeps the contractor register that fit-out firms join.

1.

### Before the licence

  - **Trade name and initial approval** DET

2.

### The licence

  - **Trade licence** DET

3.

### After the licence

  - **Engineering office registration** Dubai Municipality
  - **Contractor registration, for fit-out** Dubai Municipality
  - **Fit-out permit per project** The area's authority, such as DDA
  - **Corporate bank account** The bank
  - **Visas for designers and site staff** MOHRE for permits, GDRFA Dubai for visas

We map which registrations your services need before the licence is filed.

## Which lane your services fall in

Each service below shows which kind of firm it needs.

Selling both drawings and site works means a structure decision comes first. The 2025 laws keep the two independent.


| What you plan | Points to |
|---|---|
| | Design studio licence |
| | Design studio licence |
| | Design studio licence |
| | Engineering consultancy office |
| | Engineering consultancy office |
| | [Registered contractor](https://dm-uae.com/activities/construction-contracting/) |
| | [Registered contractor](https://dm-uae.com/activities/construction-contracting/) |

## Fit-out deposits and the bank

Bank view **Standard for design; closer look for fit-out deposits**

Most banks see a design studio as a standard file, with professional fees from a handful of clients. Fit-out draws a closer look.

Client deposits arrive in large amounts and leave quickly for materials and subcontractors, so the bank asks for the signed contracts behind them. The payment schedule for each project goes into the file too, giving every large transfer a reason on record.

## Studio structure and registrations

- Activity wording that matches what you will sell
- A structure that keeps design and fit-out independent
- Route chosen around your clients and site work
- Registration files for Dubai Municipality where they apply
- Project contracts and payment schedules prepared for the bank

## Overreach on a design licence

1.

### Fit-out quoted on a design licence

A client who likes the design often asks the studio to build it. Executing fit-out works is contracting. Taking that job on a design licence leaves the company outside the contractor rules that apply across Dubai.

2.

### Permit drawings from the wrong firm

Drawings submitted to the authority come with engineering responsibility. Under Law 14 of 2025, only a licensed office registered with Dubai Municipality may present itself as an engineering consultancy.

3.

### Expecting one permit route everywhere

Each area's authority issues its own fit-out permits and asks for its own file. A unit in a Dubai Development Authority community and one on general mainland land can follow different paths.

## Interior design questions

**A question about your plan?** Describe your interior design and fit-out plan and an advisor replies on WhatsApp.

[Ask on WhatsApp](https://wa.me/971585562152?text=Hi%20DM%20Consultancy%2C%20I%27d%20like%20to%20check%20the%20interior%20design%20and%20fit-out%20activity%20for%20my%20business.%20Please%20share%20the%20next%20step.)

### How do I start an interior design business in Dubai?

Start from what you will sell, because design, permit drawings and building works are separate businesses in Dubai. A studio selling concepts and finishes needs a DET or free zone licence with the design activity.

### How much does an interior design licence cost in Dubai?

The services you sell drive it. Design alone needs a licence, a studio and team visas, while fit-out adds a contracting activity, Municipality contractor registration, a permit per project and site staff.

### Do I need a licence to work as an interior designer in Dubai?

Yes, to sell design work to clients. The trade licence carries the design activity, from DET or a free zone, and permit drawings or site works each need a further registration.

### Can an interior design company also do fit-out works in Dubai?

Yes, with a [contracting activity](https://dm-uae.com/activities/construction-contracting/) and Dubai Municipality contractor registration. Dubai law keeps contractors independent of engineering offices, so a studio that also does permit drawings settles its structure before filing.

### Do interior design companies need Dubai Municipality registration?

Only for some services. [Engineering consultancy](https://dm-uae.com/activities/engineering-consultancy/), architectural work included, needs Dubai Municipality registration, and fit-out works need a place on the contractor register. A studio selling concepts and finishes just needs the right licence wording.

### Who applies for the fit-out permit in Dubai, the designer or the contractor?

The contractor, in Dubai Development Authority communities, with the tenant's appointment letter and the owner's NOC. Other areas follow the authority that runs them, so the route is confirmed unit by unit.

### Can a free zone interior design company work on projects in Dubai?

Yes, for design, through a DET branch licence or DET's six-month operating permit. Fit-out works need a branch licence approved by Dubai Municipality, and mainland income can change the [QFZP position](https://dm-uae.com/guides/qfzp-uae-free-zone-tax-explained/).

### How long does an interior design studio licence take in Dubai?

Days for a design studio, since the licence wording is the main step. Adding fit-out works takes weeks to months, because contractor registration and classification follow the licence.

### How do I start a fit-out company in Dubai?

As a [contracting business](https://dm-uae.com/activities/construction-contracting/) first. It needs a trade licence, usually from DET, with a fit-out contracting activity, then a place on the Dubai Municipality contractor register. Each project then carries a permit from the area's authority.

### Should an interior design studio be on the mainland or in a free zone?

Either works, and your clients decide. A free zone suits design for clients abroad or in free zones. Mainland clients are simplest on a DET licence, which a studio that also builds usually takes anyway.

## Related pages

- [**Construction company licence under Law 7** DET issues the trade licence, and since January 2026 Dubai Municipality also registers and classifies each contractor before it takes on work.](https://dm-uae.com/activities/construction-contracting/)
- [**DET mainland licence for Dubai clients** Dubai mainland company formation with a DET licence: trade across the UAE, bid for government tenders and hold 100% ownership for most activities.](https://dm-uae.com/mainland/dubai/)
- [**Carpentry and joinery licence in Dubai** A carpentry licence covers joinery made in your workshop, and fitting it on site or batch production adds a licence step.](https://dm-uae.com/activities/carpentry-joinery/)

## Will your studio build what it designs?

Building it needs a contracting activity as well. If your services run from concept to site, we set out the activity wording and a structure that keeps designing and building apart.

[Book a 15-minute call](https://calendar.google.com/calendar/appointments/schedules/AcZssZ3iUsl6OhHy5YEyFEpygJBYbMbGDZ7fIiA2jzn36qH26vKRo_PDEpn0EzJeySwjrl1R9zHtZnVN?gv=true)[Message us on WhatsApp](https://wa.me/971585562152?text=Hi%20DM%20Consultancy%2C%20I%27d%20like%20to%20check%20the%20interior%20design%20and%20fit-out%20activity%20for%20my%20business.%20Please%20share%20the%20next%20step.)

On the call

1. Permit drawings and engineering responsibility
2. Where your fit-out projects sit