# Data centre licence, racks or your own hall

Reselling rack space is a light licence. Building your own hall, or hosting for government, brings approvals of its own.

[Book a 15-minute call](https://calendar.google.com/calendar/appointments/schedules/AcZssZ3iUsl6OhHy5YEyFEpygJBYbMbGDZ7fIiA2jzn36qH26vKRo_PDEpn0EzJeySwjrl1R9zHtZnVN?gv=true)[Or message us on WhatsApp](https://wa.me/971585562152?text=Hi%20DM%20Consultancy%2C%20I%27d%20like%20to%20check%20the%20data%20centre%20activity%20for%20my%20business.%20Please%20share%20the%20next%20step.)

![Rows of locked server cabinets along a clean aisle in a colocation data hall](https://dm-uae.com/assets/images/activities/data-centre.webp)

Usual route

Mainland or free zone

Extra approval

DEWA power

AML

Standard bank checks

At a glance

A data centre licence in Dubai is issued by DET or a free zone, with colocation as the core activity and hosting added when you manage clients' machines. Renting out racks in an existing facility is the simplest model. A hall of your own brings in DEWA, whose connection must match the load. Cloud work for Dubai government bodies needs DESC certification.

Covers

Renting rack space, power and cooling for client-owned servers

Not covered

Selling internet connectivity, which stays with TDRA-licensed carriers

Premises

Your own hall, or contracted space in an existing facility

Timeline

Weeks to resell capacity; months or longer to build a hall

## Inside a data centre licence

Colocation rents rack space to clients who bring their own servers. Power, cooling, cross-connects and remote hands come with the space.

### Inside this licence

-
-
-
-
-

### Outside this licence

- Covered by TDRA-licensed telecom operators
- Covered by Data processing and hosting
- Covered by [Cyber security company](https://dm-uae.com/activities/cybersecurity/)
- Covered by [IT equipment trading](https://dm-uae.com/industries/general-trading/)

Managed IT and software sold as a service are separate activity codes again, added only if you sell them.

## Choosing a data centre route

The licence route follows your tenants. For a hall of your own, the plot comes first, because Dubai Municipality or the zone's authority issues the building permit.

Likely route by where most of your clients are

| If most of your clients are | Likely route | Why |
|---|---|---|
| Reselling racks in an existing facility | Either route | A light licence that can sit wherever your clients and team are |
| Building a hall on your own plot | Either route | The authority over the plot approves the building, so land comes first |
| Hosting and cloud for mainland clients | Mainland (DET) | Hosting income from mainland clients usually falls outside the free zone 0% rate |
| Overseas tenants needing a Gulf point of presence | Free zone | Clients outside the mainland suit a free zone licence well |

Serving mainland tenants from a free zone takes a DET branch licence or permit. Executive Council Resolution 11 of 2025 allows both. For QFZP, that hosting income usually counts as non-qualifying.

A free zone suits operators whose tenants are abroad or inside the zones, and we check the host facility sits in that same zone. [Compare free zones](https://dm-uae.com/free-zones/)

[Company formation in the UAE](https://dm-uae.com/company-setup/)

## Building, power and hosting approvals

A reseller needs the licence and a sound capacity contract with the host. Building your own hall brings in Civil Defence for the fire systems and DEWA for the power supply.

1.

### Before the licence

  - **Initial approval for the colocation activity** DET or the free zone

2.

### The licence

  - **Trade licence** DET or the free zone

3.

### Alongside the licence

  - **Building permit for the hall** The authority over the plot
  - **Fire safety approval** Dubai Civil Defence
  - **Power connection and capacity** Dubai Electricity and Water Authority (DEWA)

4.

### After the licence

  - **Cloud certification for government** Dubai Electronic Security Center (DESC)
  - **Corporate bank account** The bank

We time the licence to your first tenant's move-in date.

## What does your data centre model add?

Each model you run in the first two years adds its own layer beyond the licence.

Power capacity is usually the slowest part of a new hall, so we raise the DEWA connection before the lease or plot is signed.


| What you plan | Points to |
|---|---|
| | The licence with colocation and hosting activities, plus tight contracts with the host facility |
| | The licence with colocation and hosting activities, plus tight contracts with the host facility |
| | DESC cloud service provider certification before Dubai government bodies can use it |
| | Links bought from TDRA-licensed carriers, since only they sell connectivity |
| | A building permit, Civil Defence fire approval and a DEWA power connection |
| | A building permit, Civil Defence fire approval and a DEWA power connection |

## What banks ask a data centre operator

Bank view **Standard, with close reading of equipment imports and lease costs**

A data centre spends heavily before it earns. Servers and cooling plant are paid for abroad early, because the kit has to be in the racks before any tenant pays.

Two documents show where income will come from. One is the facility lease or capacity contract, and the other is the first signed tenant agreement.

## Licence work for colocation operators

- Activity list covering colocation and hosting from the first filing
- Route set by the facility, the plot and your tenants
- Building permit, Civil Defence and DEWA steps in one plan
- Equipment imports and tenant contracts set out for the bank
- DESC certification mapped for any government cloud work

## Data centre contract traps

1.

### A lease signed before power is confirmed

Rent starts on signature. If DEWA has not yet confirmed the connection and its capacity, the hall sits idle, unable to take a single loaded rack.

2.

### Hosting left off a colocation licence

Running applications or cloud services for a tenant counts as hosting, which is a separate activity. Contracts signed before it is added fall outside the licence.

3.

### Promising connectivity the licence cannot sell

Internet links are a telecom service sold by TDRA-licensed operators. A tenant contract that bundles bandwidth as your own product needs rewording around the carriers in your building.

## Data centre questions

**A question about your plan?** Describe your data centre plan and an advisor replies on WhatsApp.

[Ask on WhatsApp](https://wa.me/971585562152?text=Hi%20DM%20Consultancy%2C%20I%27d%20like%20to%20check%20the%20data%20centre%20activity%20for%20my%20business.%20Please%20share%20the%20next%20step.)

### What are the requirements for a data centre licence in Dubai?

Colocation on a DET or free zone licence, plus a hosting activity if you run servers for clients. Reselling capacity needs little more. A hall of your own adds a building permit, Civil Defence approval and DEWA power.

### How much does a data centre licence cost in Dubai?

The facility matters more than the licence. Reselling racks in another hall stays close to a standard services licence. Your own hall adds approvals, a DEWA connection and imported servers and cooling plant.

### How to start a data centre business in Dubai?

Choose the model first: reselling capacity in an existing hall, or building one. Resellers can be licensed within weeks, while your own hall takes months or longer because the plot, permit and power come first.

### Can a foreigner open a data centre company in Dubai?

Yes. Free zones allow outright foreign ownership, and most mainland activities allow it under DET, with the current list confirming it for colocation and hosting. Many new owners start by reselling racks in an established facility.

### What are the power requirements for a data centre in Dubai?

Power is the deciding requirement, and DEWA supplies it. An owned hall needs a connection sized to the full IT and cooling load, confirmed before the plot is committed. Resellers fix the capacity in the host contract.

### Do I need a building permit for a data centre in Dubai?

For a hall you build or convert, yes, including an edge site in a leased building. The permit comes from the authority over the plot and Civil Defence approves the fire systems. Resellers need none of it.

### Can I open an AI data centre in Dubai?

You can, and it is licensed like any other, with colocation for client GPU servers and hosting if you sell compute. Dense GPU racks draw far more power and cooling, so the DEWA connection usually decides the site.

### Do I need a separate licence for cloud hosting in Dubai?

Not a separate licence, but a separate activity on the same one. Colocation rents rack space for servers the client runs, while hosting means you run the servers or software for them.

### Which cloud rules apply to hosting Dubai government data?

The DESC Cloud Service Provider Security Standard, which is mandatory for providers serving Dubai government or semi-government entities. It brings an annual audit and recertification every three years.

### Can I resell rack space in Dubai without building a data centre?

Yes, and it is the lightest model: the colocation activity plus a contract for the capacity you resell. The host holds the building approvals and power, and bandwidth stays with TDRA-licensed carriers.

### Can a data centre company set up in a free zone?

Yes, with colocation and hosting on a free zone licence, which suits tenants abroad or inside the zones. Mainland tenants are reached through a DET branch licence or permit, and their hosting income is usually [non-qualifying](https://dm-uae.com/guides/qfzp-uae-free-zone-tax-explained/) for the 0% rate.

## Related pages

- [**Software and IT company setup in Dubai** A software company license in Dubai: the activity classification, free zone or mainland, QFZP exposure on mainland clients, visas and banking.](https://dm-uae.com/industries/it-software/)
- [**AI company licence in Dubai** The licence itself is quick once the activity matches what you build.](https://dm-uae.com/activities/ai-company/)
- [**Corporate bank accounts in Dubai** Corporate bank account opening in Dubai, prepared before you apply: the file a UAE bank reads, the right bank for your profile and a strong first file.](https://dm-uae.com/banking/)

## Reselling racks or building your own hall?

Each one needs a different power request. Your advisor reads your plan for the first two years and names the activities to file and the approvals that come with them.

[Book a 15-minute call](https://calendar.google.com/calendar/appointments/schedules/AcZssZ3iUsl6OhHy5YEyFEpygJBYbMbGDZ7fIiA2jzn36qH26vKRo_PDEpn0EzJeySwjrl1R9zHtZnVN?gv=true)[Message us on WhatsApp](https://wa.me/971585562152?text=Hi%20DM%20Consultancy%2C%20I%27d%20like%20to%20check%20the%20data%20centre%20activity%20for%20my%20business.%20Please%20share%20the%20next%20step.)

On the call

1. Colocation, hosting or government cloud
2. The host facility or your own plot