---
title: Construction Company Licence in Dubai, Law 7 of 2025
url: https://dm-uae.com/activities/construction-contracting/
description: What a construction company licence needs in Dubai: the DET activity, Dubai Municipality contractor registration and classification, and the 2027 deadline.
updated: 2026-11-03
source: DM Consultancy (dm-uae.com). The HTML page is the reference version.
---
# Construction company licence, for classified contractors

DET issues the trade licence, and since January 2026 Dubai Municipality also registers and classifies each contractor before it takes on work.

[Book a 15-minute call](https://calendar.google.com/calendar/appointments/schedules/AcZssZ3iUsl6OhHy5YEyFEpygJBYbMbGDZ7fIiA2jzn36qH26vKRo_PDEpn0EzJeySwjrl1R9zHtZnVN?gv=true)[Or message us on WhatsApp](https://wa.me/971585562152?text=Hi%20DM%20Consultancy%2C%20I%27d%20like%20to%20check%20the%20construction%20contracting%20activity%20for%20my%20business.%20Please%20share%20the%20next%20step.)

![Site engineer in a hard hat and safety vest checking her clipboard at a construction project](https://dm-uae.com/assets/images/activities/construction-contracting.webp)

Usual route

Mainland (DET)

Extra approval

Municipality register

AML

Standard bank checks

At a glance

A construction company licence in Dubai comes from DET, and since 8 January 2026 the company must also be on Dubai Municipality's contractor register under Law 7 of 2025. Its classification limits the jobs it may take. Engineers and technicians need competency certificates. The law reaches free zones too, and contractors already trading have until about 8 January 2027 to regularise.

Covers

Civil and building works, within your classification

Not covered

Design and supervision (an engineering consultancy office)

Premises

A real office; the register checks your capability

Timeline

Weeks to months, led by registration and staff certificates

## What a building contracting licence covers

The activity covers the works you build and invoice for, inside the limits your classification sets.

### Inside this licence

-
-
-
-

### Outside this licence

- Covered by [Engineering consultancy office](https://dm-uae.com/activities/engineering-consultancy/)
- Covered by [Technical services](https://dm-uae.com/activities/technical-services/)
- Covered by [Interior design and fit-out](https://dm-uae.com/activities/interior-design-fit-out/)
- Covered by [Real estate developer (DLD)](https://dm-uae.com/activities/real-estate-developer/)

Repairs in occupied buildings fall under technical services, and selling off-plan units you build is real estate development under DLD. Window, door, glass and facade installers work on an [aluminium and glass licence](https://dm-uae.com/activities/aluminium-glass/).

## The licence a contractor works from

Building happens on site, and most contractors work from a DET licence with an office lease registered in Ejari.

Likely route by where most of your clients are

| If most of your clients are | Likely route | Why |
|---|---|---|
| Private owners and developers across Dubai | Mainland (DET) | Mainland sites and clients sit naturally on a DET licence |
| Projects in free zones and on the mainland | Either route | Mainland sites are reached from a free zone through a DET branch |
| Main contractors, with you as a subcontractor | Either route | Every party in the chain needs its own registration |

A free zone contractor can build on mainland sites through a DET branch licence, once Dubai Municipality approves it as the regulator. The legal basis is Executive Council Resolution 11 of 2025. The six-month operating permit covers non-regulated work only, so contracting cannot use it, and mainland income can change how profits qualify under QFZP.

Contractors whose projects sit inside zones can work from a free zone, and their Dubai Municipality registration and classification apply all the same. [Compare free zones](https://dm-uae.com/free-zones/)

[Company formation in the UAE](https://dm-uae.com/company-setup/)

## Who signs off a contractor

After the DET licence, Dubai Municipality registers and classifies the company on the unified contractor register. Project permits and subcontract approvals then follow job by job.

1.

### Before the licence

  - **Trade name and initial approval** DET

2.

### The licence

  - **Trade licence** DET

3.

### After the licence

  - **Contractor registration and classification** Dubai Municipality
  - **Staff competency certificates** Dubai Municipality
  - **Permits for each project** Dubai Municipality or the area authority
  - **Subcontract approvals** Dubai Municipality or the activity's regulator
  - **Corporate bank account** The bank
  - **Work permits and labour accommodation** MOHRE

We build the classification file while the licence is being issued.

## Licence and register run side by side

The licence comes quickly. Work starts once the register is done, because the classification limits which jobs the company may take.

Contractors already trading must regularise by about 8 January 2027, a date the committee can extend.

### Trade licence (DET)

1. Trade name and approval Days
2. Licence issued Days

### Contractor register (Dubai Municipality)

1. Registration on the register Weeks
2. Classification by capability Weeks
3. Staff competency certificates Weeks

## What banks ask a contracting company

Bank view **Closer look: contracts, payroll and subcontract chains**

A contracting company draws a closer look at account opening. The bank wants signed contracts or awarded tenders first. Then it looks at how money moves down the subcontract chain, and whether a payroll paid through WPS fits the size of the site team.

Large payments with no contract behind them raise questions at review. The register status goes in with the first contracts.

## Setting up a classified contractor

- Activity wording matched to the works you will build
- Route chosen around your sites and any existing licence
- Classification file prepared for the Dubai Municipality register
- Competency certificates requested for engineers and technicians
- Account file based on contracts and payroll
- Labour accommodation planned as the site team grows

## Register and classification traps

1.

### Treating the register as a later step

Founders often finish the trade licence and only then look at Dubai Municipality registration. Project owners must appoint registered contractors, so a licensed but unregistered company cannot sign its first job.

2.

### A classification file that undersells the team

Dubai Municipality classifies on capability and experience. A file that leaves out the engineers' certificates or the balance sheet caps the jobs the company may bid for.

3.

### Design and build in one firm

Engineers who start a firm often want to design and build. Law 7 of 2025 keeps contractors independent of engineering consultancy offices, so the design side needs a separate firm with its own licence.

## Construction company questions

**A question about your plan?** Describe your construction contracting plan and an advisor replies on WhatsApp.

[Ask on WhatsApp](https://wa.me/971585562152?text=Hi%20DM%20Consultancy%2C%20I%27d%20like%20to%20check%20the%20construction%20contracting%20activity%20for%20my%20business.%20Please%20share%20the%20next%20step.)

### How do I start a construction company in Dubai?

The contractor register matters more than the trade licence. After DET licenses the company, Dubai Municipality registers and classifies it under Law 7 of 2025, and owners can only appoint registered contractors.

### How much does a construction company licence cost in Dubai?

The classification you aim for drives it. A higher class means more certified engineers on the payroll and a stronger opening balance sheet, with the licence, office, site visas and later labour accommodation on top.

### What licence does a building contractor need in Dubai?

A DET trade licence with a building contracting activity, plus registration and classification on Dubai Municipality's contractor register. Design and supervision belong to a separate [engineering consultancy office](https://dm-uae.com/activities/engineering-consultancy/).

### Do I need Dubai Municipality classification to start a construction company?

Yes. Since 8 January 2026, Dubai contractors sit on the municipality register and may only take work inside their classification, which weighs finances, the technical team and the track record.

### Can a free zone construction company build on the Dubai mainland?

It can, but the Law 7 register applies inside free zones too. Mainland sites need a DET branch licence with Dubai Municipality's approval, or a mainland company, and mainland income can change results under the [QFZP rules](https://dm-uae.com/guides/qfzp-uae-free-zone-tax-explained/).

### How long does it take to open a construction company in Dubai?

Weeks to months. The DET licence is quick, while registration, classification and staff competency certificates set the pace. Hiring certified engineers early helps, since the register looks at the team in place.

### Do existing contractors have to join the new Dubai contractor register?

They do. Contractors already trading when Law 7 of 2025 took effect have until about 8 January 2027 to regularise, and that date can be extended. The law reaches free zones and the DIFC too.

### Can a foreigner own a construction company in Dubai?

In most cases, yes. Full foreign ownership is open for most mainland activities, and DET's current list confirms it for the exact contracting activity. Free zone companies are foreign-owned as a matter of course.

### Can a construction company also be an engineering consultancy in Dubai?

No. Law 7 of 2025 requires a registered contractor to stay independent of engineering consultancy offices, so a founder who wants both plans the ownership of the two firms first.

### Does a construction company need a permit for each project in Dubai?

Each project needs its own permits, yes, from Dubai Municipality or the development authority for that area. The job must also sit inside your classification before the owner can appoint you.

## Related pages

- [**Interior design licence and where fit-out starts** Designing interiors and building them are separate businesses in Dubai.](https://dm-uae.com/activities/interior-design-fit-out/)
- [**Mainland company setup with DET in Dubai** Dubai mainland company formation with a DET licence: trade across the UAE, bid for government tenders and hold 100% ownership for most activities.](https://dm-uae.com/mainland/dubai/)
- [**Corporate bank accounts and what banks check** Corporate bank account opening in Dubai, prepared before you apply: the file a UAE bank reads, the right bank for your profile and a strong first file.](https://dm-uae.com/banking/)

## Is the contractor register in your plan?

Give us the works you plan to bid for, and we work out the activity wording and the classification your team can support.

[Book a 15-minute call](https://calendar.google.com/calendar/appointments/schedules/AcZssZ3iUsl6OhHy5YEyFEpygJBYbMbGDZ7fIiA2jzn36qH26vKRo_PDEpn0EzJeySwjrl1R9zHtZnVN?gv=true)[Message us on WhatsApp](https://wa.me/971585562152?text=Hi%20DM%20Consultancy%2C%20I%27d%20like%20to%20check%20the%20construction%20contracting%20activity%20for%20my%20business.%20Please%20share%20the%20next%20step.)

On the call

1. Engineers' certificates and the balance sheet
2. Your sites and any existing licence

Replies within two business hours, Monday to Saturday. [About the firm](https://dm-uae.com/about/) [Prefer to write? Send the details](https://dm-uae.com/contact/)

![Portrait of your advisor](https://dm-uae.com/assets/images/manish-portrait-cut-w480.webp)
